CEVA Alliance
Frasers Property
Project Type:
Design and Construct
Completion Date:
December 31, 2017
Sector:
Logistics
Project Features:
+

Energy Efficiency

+

Green Star Compliant

+

Lighting Control

+

Energy Usage Remote Monitoring

+

Power Factor Correction

+

Fibre Optic

+

Wireless Access Points

+

Lighting Design

CEVA Alliance


Scarlett contracting was engaged to completed the electrical works for Frasers Property for a 35 million dollar project which was completed in 28 weeks. The project was a 6 star Greenstar project which included all monitoring of light, power water usage through the Bitpool metering technology.

The KNX lighting control system in the office and warehouses allowing maximum energy saving features which allows warehouse lighting to be dimmed at different times of the day depending upon natural light levels and movement in the given areas and isolation of lighting through the sensors.

Central to the warehouse is a three floor picking structure which had 600 LED battens controlled by sensors and exit and emergencies to be installed to BCA requirements.


Greenfield construction of 42000 square meter under roof warehouse with site area of 86000 square metre distribution centre for CEVA Logistics.

No items found.

ReLAted PROJECTS

Mazda Epping

Frasers Property

Epping

View PROJECT

Braeside Spec 2

Frasers Property

Braeside

View PROJECT

Braeside Spec 3

Frasers Property

Braeside

View PROJECT

Agility Logistics

Qanstruct

Melbourne Airport

View PROJECT

Roussos Place

Hansen Yuncken

Truganina

View PROJECT

Carpet Call

Access Constructions

Notting Hill

View PROJECT

Key Spec 7

Frasers Property

Braeside

View PROJECT

Bunzl

Vaughan Constructions

Dandenong South

View PROJECT

Babbage Drive

Elite Property Group

Dandenong South

View PROJECT

Linfox

Vaughan Constructions

Darwin, Australia

View PROJECT